Older Paint Layers Stay in Place
Lead was added to paint for durability and color retention, which is exactly why it can remain under newer coatings for decades.
EPA-Certified Testing for Pre-1978 Properties
Everest Building Consulting Group provides EPA-certified lead-based paint inspection for residential and commercial properties throughout Florida. We determine whether lead-based paint is present, where it is, and whether it currently presents a hazard, with laboratory-backed documentation for renovation, disclosure, and compliance.
Contact the experts at Everest today!
If the building went up before 1978, lead-based paint is a real possibility, and you cannot rule it out by looking at it.
The federal ban on residential lead paint took effect in 1978, but paint applied before then is still in place across millions of American homes and buildings. It is often buried under later coats, which means the surface you are about to sand, scrape, or demolish may have lead underneath it.
Everest BCG provides EPA-certified lead-based paint inspection and testing for residential and commercial properties across Florida. We determine whether lead is present, where it is, and whether it currently presents a hazard, with documentation that satisfies regulatory and transactional requirements.
Lead paint becomes a problem when age, wear, or renovation turns a stable coating into dust, chips, and contaminated surfaces.
Lead was added to paint for durability and color retention, which is exactly why it can remain under newer coatings for decades.
Chipping, chalking, peeling, sanding, scraping, cutting, and demolition can all generate lead dust that normal cleaning does not reliably remove.
Windows, doors, jambs, trim, stairs, and exterior surfaces often carry the exposure risk because they wear, bind, scrape, and shed.
Children under six are the primary concern because of hand-to-mouth contact and higher absorption. Adults performing renovation work face occupational exposure risk as well.
Plenty of pre-1978 buildings test negative on most components, while renovated interiors may still have original lead paint on frames, trim, jambs, and exterior surfaces.
Lead testing is most useful before the surface changes, the transaction clock starts, or occupancy turns the condition into a liability issue.
The EPA RRP Rule applies to contractors disturbing painted surfaces in pre-1978 housing and child-occupied facilities. Testing confirms whether lead-safe work practices are required.
Buyers of most pre-1978 housing have a short inspection window. Having a firm lined up before it opens keeps the deal from waiting on the calendar.
Owners and managers can document the condition of pre-1978 rental property at a specific date.
Child-occupied facilities built before 1978 sit under the same regulatory framework as housing, with higher stakes because of who uses the space.
Medical questions belong with the physician. When a source investigation is needed, a risk assessment helps locate the environmental path.
Lead-containing materials affect safety planning, work practices, disposal, and project cost. Those decisions need test data.
This gets blurred constantly, and ordering the wrong one wastes money. The right scope depends on the question you need answered.
Surface-by-surface testing that determines whether lead-based paint is present and on which components. It tells you what is there, not whether it is currently a hazard.
Evaluation of whether lead hazards exist right now, including paint condition, friction points, dust, soil, hazard locations, and control options.
Both together, usually the right call when you need to know what exists and what to do about it.
Post-abatement verification that dust-lead levels meet current standards before a space is reoccupied.
EPA finalized revised dust-lead standards in 2024. They became effective in January 2025, with compliance for the revised levels required in EPA-administered jurisdictions, including Florida, as of January 12, 2026.
This is general information, not legal advice. Confirm project-specific requirements with the agency, owner, counsel, or regulatory professional responsible for the file.
Dust-lead reportable levels, formerly called hazard standards, are now any reportable level as analyzed by a laboratory recognized under EPA's National Lead Laboratory Accreditation Program. EPA links this change to the absence of an identified safe blood lead level for children. EPA standard details
Dust-lead action level after abatement.
Lowered from the prior 100 ug/ft2 clearance level.
Lowered from the prior 400 ug/ft2 clearance level.
Practical result: dust results that would have passed under old standards may not pass now. If your property was tested or cleared before 2025, those results reflect a superseded standard.
The method depends on whether we are answering a paint inventory question, a current hazard question, or a clearance question.
X-ray fluorescence testing reads lead content in paint layers in place, without damaging the surface. It works component by component and produces immediate results across a large number of surfaces.
Where XRF results are inconclusive or the substrate interferes, physical samples go to an accredited laboratory for confirmation.
Standardized wipe samples from floors, sills, and troughs are analyzed by an NLLAP-recognized laboratory. This is what determines dust hazards and what governs clearance.
Exterior soil is sampled near drip lines and play areas where deteriorated exterior paint accumulates.
We document paint condition, deterioration, friction and impact surfaces, and the specific locations where hazards are developing.
A pre-purchase inspection, a renovation clearance question, and a rental compliance file each call for different scopes.
We establish the property age, the reason for testing, and what documentation you need at the end.
A certified inspector or risk assessor performs the testing. XRF results are available on site, while dust, chip, and soil samples travel under documented chain of custody to an accredited laboratory.
You receive a written report identifying tested components, results, condition, and, where a risk assessment was performed, identified hazards and control options.
The report has to satisfy the next reader, whether that is a buyer, landlord, contractor, regulator, attorney, or abatement firm.
A firm that gets paid to remove lead paint has an obvious reason to find more of it. Ours is a testing fee that does not change based on the result.
That matters in a transaction, where both sides need to trust the number, and it matters on a renovation, where clearing components as negative can remove regulatory obligations and cut project cost substantially.
Different parties need different records, but the core question stays the same: what is present, where is it, and what does it mean?
Renovating a pre-1978 house, particularly with young children in the home.
Confirm before sanding, scraping, window work, or demolition.Using the 10-day inspection window during a transaction.
Get facts before the window closes.Managing pre-1978 rental inventory with disclosure obligations.
Document condition at a specific date.Scoping work where EPA RRP requirements may apply.
Know which components trigger lead-safe practices.Operating in older buildings used by children under six.
Locate hazards before maintenance becomes exposure.Planning renovation or demolition of older structures.
Support worker protection, waste handling, and scope decisions.Requiring documented conditions in a dispute or claim.
Use a technical record instead of competing assumptions.Sample analysis is performed by independent accredited laboratories, and the field scope is handled by certified professionals.
Certified personnel perform lead paint inspection, testing, and risk-assessment support.
Dust, paint chip, and soil samples are analyzed by qualified independent laboratories.
On-site XRF readings are paired with laboratory confirmation where the scope calls for it.
Clearance and risk-assessment files rely on standardized dust wipe sampling and current standards.
AHERA-certified, MRSA-licensed, and OSHA-trained professionals support complex building questions when needed.
Reports are organized so findings can be read by owners, contractors, adjusters, regulators, and counsel.
Testing is available for homes, multifamily properties, schools, child-occupied facilities, and commercial buildings.
Everest does not profit from lead removal, so the report is not tied to a remediation sale.
Our office is in Altamonte Springs, and we test properties statewide, including Central Florida, the Orlando metro, both coasts, and South Florida.
Building stock varies considerably across the state. Older neighborhoods, historic districts, pre-war commercial inventory, and coastal exposure all shape where lead paint is most likely to become a hazard.
Testing before renovation costs a fraction of what it costs to stop a job, contain a contaminated space, and start over. Everest BCG provides EPA-certified lead-based paint inspection and testing for residential and commercial properties throughout Florida, with laboratory-backed results and documentation that meets disclosure and compliance requirements.